The land is located at a distance of 6km from Zavidovići, separated from populated areas, with adequate access road and lighting directly to the complex. The land is extremely sunny throughout the day, so it provides great opportunities in the exploitation of solar energy. Relevant persons from the electricity sector in their comments and analyzes positively comment on the possibility of exploitation and further distribution of solar energy, and in full
support the realization of the project. The land is also rich in sources of drinking water with several built pools for collecting water, so that in addition to solar energy, the terrain also opens the possibility of exploitation of drinking water.
2021 © mhx-invest. All Rights Reserved. Powered by AdinHa